About the Project
This project will construct a trail along the south side of 208th St SE between the 9th Ave SE/SR 524 intersection and the current end of North Creek Trail Section 3 just west of the Bothell-Everett Highway (SR 527).
The will construct about 0.58 miles of 10-foot wide separated paved trail with a planter strip, pedestrian bridge, structural earth wall, wider culverts, a signal upgrade, ramp work, street light relocation, wetland mitigation, and utility adjustments.