This project replaced and improved various utilities at several downtown locations.
Water Main
Replaced the existing asbestos cement (AC) water main along NE 188th Street with 12-inch ductile iron water main between Horse Creek and Bothell Way NE.
Replaced the existing AC water main with 8-inch ductile iron water main from 98th Avenue NE to 96th Avenue.
Sewer Main
Replaced the existing concrete sanitary sewer main along NE 182nd Street from 98th Avenue NE to 96th Avenue.
Storm Drain
Installed a 24-inch storm drainage system along NE 182nd Street from 98th Avenue NE to 97th Avenue and along Ormbrek Street respectively.
Schedule
Bid Opening: November 16, 2015
Construction Phase: Late February to late May 2016