- Home
- Your Government
- Departments
- Public Works
- Capital Improvement Projects
- Design and Construction
Design and Construction
-
102nd Ave NE Downtown Access Improvements
Improving pedestrian access to downtown via 102nd Ave NE by reconstructing damaged sidewalks and updating curb ramps and lighting to meet ADA requirements.
-
228th St SE Widening
The City of Bothell and Snohomish County propose to widen 228th St SE from 3 lanes to 5 lanes and improve intersections at 35th Ave SE and 39th Ave SE.
-
Annual Utility Capital Projects
The City annually funds the repair, replacement or upgrade of water, sewer and storm/surface water utilities.
-
Beardslee Blvd Widening
This project will widen Beardslee Blvd from the University of Washington Bothell/Cascadia College campus to I-405.
-
Bike Plan
The City of Bothell is currently in the process of updating its Citywide Bike Plan. The purpose of this update is to meet Comprehensive Plan goals which support the Puget Sound Regional Council’s Active Transportation Plan objectives. The updated plan will also serve as a guide for prioritizing and implementing bike network improvements that can be integrated into the City’s Capital Facilities Plan.
-
Bothell Way Widening
The Bothell Way Widening Project will add lanes to Bothell Way to accommodate vehicle, bicycle, and pedestrian traffic.
-
Blyth Park Erosion Control
This project proposes to improve the storm drainage system in Blyth Park.
-
Downtown Contaminated Soil & Groundwater Clean Up
This project is a component of Bothell's Downtown Revitalization Plan and is identified in the Capital Facilities Plan as T47.
-
Downtown Overlay and Utility Project
This project proposes to pave several segments near Main Street in downtown Bothell.
-
Fire Station Replacements Phase I
Replacement of Fire Stations 45 and 42. Phase I Project Management Selection
-
Main Street Extension
This project extends Main Street westward to 98th Ave NE. It ties the historic portion of Main Street to the new development west of Bothell Way NE.
-
Meridian Ave S and 240th St SE Roundabout
This project will construct a roundabout at the intersection of Meridian Ave S and 240th St SE.
-
NE 185th St. Utility Improvements Project
The project will improve water, sewer, and stormwater utilities and rehabilitate pavement on NE 185th St. from Bothell Way NE to Beardslee Blvd.
-
Valhalla Utility Improvement Project
The Valhalla Utility Improvement Project will upgrade failing utility infrastructure within the Valhalla neighborhood and will construct a new sewer bypass line.
Check out the City's upcoming projects and recently completed projects.